Abstract
A discussion on delayed coking presented at the 56th Annual NPRA Technology Q&A (2002, Philadelphia, PA) covers safely spalling of a multi-pass heater with a common convection section; parameters such as heater tube diameters, which prohibit on-line spalling; metallurgy upgrades, e.g., 347 stainless steel or high nickel alloys, etc, or internal coatings being considered for coker heater tubes; experience with once-through coking; design and operation of a fractionator wash section to minimize heavy coker gas oil filtration requirements; reduction of plugging; methods used to free a drill stem stuck in the coke bed; the best cutting technique, i.e., top to bottom or bottom to top; parameters that reduce coke drum foaming to allow reduced antifoam addition; handling of coke formation in the top dome of coke drums; best procedure for minimizing coke fines in coker cutting water; and issues arising when utilizing a common gas plant for petrochemical feedstock recovery from FCC unit and delayed coker units.
| Original language | English |
|---|---|
| Journal | NPRA Question and Answer Session on Refining and Petrochemical Technology |
| State | Published - 2002 |
| Externally published | Yes |
| Event | 2002 NPRA Technology Q and A Transcripts: Refining Excellence - Philadelphia, PA., United States Duration: 15 Oct 2002 → 18 Oct 2002 |
Fingerprint
Dive into the research topics of 'Crude & vacuum distillation and delayed coking: Delaying Coking'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver