Abstract
This paper exams that how to select a method in gas drainage in coal mining face, when there is a difficulty in return road construction or on the process of connecting the mine road in work-face making an open-off cut, it can utilize the third road nearby work-face (belt roads, railroads and pedestrian roads, air return tunnel, etc) to adopt making a hole into the exploited empty area, and then making the gas in the exploited empty area flow into the third tunnel, forming a three-side tunnel to drainage gas. It can solve the above mentioned problems effectively. And simultaneously it proposes a warranty whether it can achieve anticipated effect for transportation tunnel construction.
| Original language | English |
|---|---|
| Pages (from-to) | 4-6 |
| Number of pages | 3 |
| Journal | Liaoning Gongcheng Jishu Daxue Xuebao (Ziran Kexue Ban)/Journal of Liaoning Technical University (Natural Science Edition) |
| Volume | 26 |
| Issue number | SUPPL. 2 |
| State | Published - Nov 2007 |
| Externally published | Yes |
Keywords
- Holing and connect
- Pulling gas
- Three sides to release